The correct choice for who originates the PCC Plant Report is the contractor. The contractor is responsible for the overall management of the concrete supply and production. They must ensure that all materials meet the specifications outlined in the project documents, which includes maintaining quality control measures at the concrete plant.

As part of this responsibility, the contractor compiles relevant data and completes the PCC Plant Report, which includes information about the production of concrete, mix designs, and any adjustments made during the mixing process. This report is critical for documentation and helps maintain compliance with the standards set by the Department of Transportation and other regulatory bodies.

While the DOTD inspector, project manager, and concrete supplier all play important roles in the oversight and execution of the concrete work, their functions do not include the direct creation of the PCC Plant Report. The inspector conducts evaluations and checks compliance, the project manager oversees the project's overall progress, and the supplier provides the materials. However, it is the contractor who is tasked with reporting on the production process through the PCC Plant Report.